Sellwood Standing Seam
A low-slope modern addition needed a roof that could take four months of rain without a single exposed fastener. Panels were roll-formed on site.

Why metal
A low-slope modern addition with a long unbroken run needed a covering that could take four months of Pacific Northwest rain with no exposed fasteners anywhere in the field.
On-site fabrication
Panels were roll-formed on site to the exact length of the run, eliminating every horizontal seam. Each panel is mechanically seamed and clipped, so the roof can move with temperature without loosening a single fixing.
The finished assembly carries a 40-year finish warranty and should outlast two asphalt roofs on the same house.
Project record
Location
Sellwood, Portland
Scope
Standing seam metal roof
Materials
24-gauge steel, mechanically seamed
Duration
12 days
Completed
2025



Evidence / Same vantage point
Drag the line.
Photographed from the same position before demolition and after the final walk‑through. Nothing is retouched or staged.